The primary objective of this feasibility study is to assess the feasibility and acceptability, and potential clinical significance of an adaptive stepped-care intervention for improving sleep quality among Chinese cancer patients with mild-to-moderate sleep disturbance, using a sequential multiple assessment randomized controlled trial (SMART) design.
See this in plain English?
AI-rewrites the medical criteria so a patient or caregiver can understand them. Always confirm with the trial site.
Feasibility outcome (1.1)
Timeframe: baseline (T0)
Feasibility outcome (1.2)
Timeframe: baseline (T0), 4-month post-intervention (T2) and 10-month post-intervention (T3)
Feasibility outcome (1.3)
Timeframe: post-intervention (T1) and 4-month post-intervention (T2)
Feasibility outcome (2)
Timeframe: post-intervention (T1; 5 weeks post-baseline) and 4-month post-intervention (T2)
Sleep disturbance
Timeframe: baseline; preintervention (T0), post-intervention (T1; 5 weeks post-baseline), 4-month post-intervention (T2) and 10-month post-intervention (T3).